Between November 2022 and October 2024, the price of querying models that met a GPT-3.5-level knowledge benchmark fell from $20 to seven cents per million tokens. A billion tokens at those rates would have cost $20,000 and $70, respectively. The benchmark held the capability threshold fixed. What changed was the price of reaching it.
An exporter might once have reserved translation and individualized support for established customers. Cheaper computation could make it worthwhile to offer the same service to buyers placing smaller orders. Whether those relationships become profitable still depends on order margins, integration costs, and the time employees spend checking the work. One input, however, has become cheap enough to change which customers the firm can afford to serve.

Financial Compute Cost, or FCC, measures attributable financial expenditure for a defined workload. Full Economic Compute Cost, or FECC, extends the account to the economic cost of producing that workload, including resource burdens borne outside the purchaser’s account. This article calculates a theoretical FCC reference of $0.0916 per 1,000 benchmark responses using measured throughput and a published rental rate. The figure estimates the cost of rented capacity under specified conditions. Establishing a full economic cost requires further evidence about production costs and resource use.
| Compute Budget | November 2022 | October 2024 | Estimated Cost Reduction |
|---|---|---|---|
| $100 | 5 million tokens | 1.43 billion tokens | 99.65% |
| $1,000 | 50 million tokens | 14.29 billion tokens | 99.65% |
| $10,000 | 500 million tokens | 142.86 billion tokens | 99.65% |
Calculated from published prices at the GPT-3.5-level MMLU threshold. The estimated reduction is the same at each budget because the price per million tokens fell from $20.00 to $0.07. Rounded token volumes show purchasing capacity. Successful business tasks would require a separate measure.
Source: Stanford HAI, 2025 AI Index Report – Link

Establishing Financial Compute Cost
A compute price needs a denominator. Tokens provide one, although their usefulness depends on the model and the task. This reference uses 1,000 completed requests with a specified model and benchmark dataset. Response length and service requirements belong alongside the cost figure. A shorter answer or a longer wait can reduce the bill while changing what the customer receives.
The benchmark ran Llama 3.1 8B Instruct on one H100 accelerator with up to 64 concurrent requests. At approximately 5,147 output tokens per second and an average response length of 395.54 tokens, producing 1,000 average responses would take about 76.85 seconds at the measured throughput. The median interval between generated tokens was 11.5 milliseconds. A deployment would need separate measures of total response time and answer quality.
Applying the published single-H100-SXM rental rate of $4.29 per hour, as of October 26, 2026, yields the theoretical FCC reference of $0.0916 per 1,000 benchmark responses. This is a reproducible estimate that prices measured steady-state performance at an advertised rate. An observed deployment bill would reflect how much capacity the operator rents and how much work that capacity actually delivers.
To calculate FCC for an operating service, divide attributable expenditure by completed workloads. The expenditure includes startup time, reserved idle capacity, and applicable taxes and service charges. A firm that owns its equipment allocates capital and operating costs across the work delivered. A firm that rents capacity already pays for equipment through the rental charge.
At half the benchmark throughput, continuously rented capacity would cost about 18 cents per 1,000 comparable responses. If 90 percent of completed responses pass the firm’s acceptance test, dividing the cost per completed response by 0.90 gives the cost per accepted result. The benchmark compares the cost of providing computation. The acceptance test tells the firm how much of that expenditure produced work it can use.
| H100 SXM GPUs | Per GPU-Hour | Per Instance-Hour |
|---|---|---|
| 1 | $4.29 | $4.29 |
| 2 | $4.19 | $8.38 |
| 4 | $4.09 | $16.36 |
| 8 | $3.99 | $31.92 |
Published on-demand rates checked October 26, 2026; taxes excluded. Instance totals are calculated. Prices do not establish equivalent workload throughput.
Sources: Lambda
Toward a Full Economic Compute Cost Baseline
The benchmark recorded approximately 46.90 joules of GPU energy per response, equivalent to 0.0130 kilowatt-hours per 1,000 responses. Adding an assumed 150 watts for supporting equipment and facility overhead equal to 20 percent of computing electricity raises the modeled requirement to 0.0195 kilowatt-hours. The first figure measures energy at the GPU. The second estimates a wider serving footprint using assumptions about the equipment and facility around it.

Training consumes resources before the first customer submits a request. Meta reported that training Llama 3.1 8B required 1.46 million H100 GPU-hours. Pricing those hours at the same $4.29 rental rate puts the theoretical replacement cost of the training compute at approximately $6.26 million. That proxy values accelerator time at the reference rate. The developer’s actual expenditure and its wider development budget are separate accounting questions.
If the model produces ten trillion output tokens over its lifetime, the training proxy contributes about $0.248 per 1,000 benchmark responses. At 100 trillion tokens, it contributes about $0.0248. These hypothetical volumes show how widely the allocation can vary with lifetime use.
| Reference Measure | Per 1,000 Benchmark Responses |
|---|---|
| Theoretical Financial Compute Cost (FCC) at published rental rate and measured throughput | $0.0916 |
| Allocated training-compute proxy | $0.0248–$0.2477 |
| Illustrative serving and training-compute subtotal | $0.1163–$0.3393 |
| Measured serving GPU electricity | 0.0130 kWh |
| Modeled whole-system serving electricity, including the GPU | 0.0195 kWh |
| Modeled serving water consumption from cooling and electricity generation | Approximately 0.10 liters |
| Illustrative serving electricity cost at $0.10 per kWh | $0.00195 |
| Illustrative serving water cost at $0.002 per liter | $0.00020 |
| Total illustrative serving electricity and water cost, reported separately | $0.00215 |
Late-2026 theoretical baseline for future comparisons. Results vary by model, hardware, utilization, facility, and region. The electricity and water total is shown separately because rental and electricity prices may already cover some of those costs. A full economic cost remains undetermined.
The subtotal of $0.1163–$0.3393 per 1,000 responses combines the theoretical serving cost with an allocated training proxy. A full economic cost remains undetermined. Completing the account requires reconciling prices with underlying production costs and valuing attributable resource burdens that those prices leave out. Rental charges can include equipment recovery and commercial margins. Adding equipment costs to the full rental charge would count part of the same expenditure twice.
Water shows why the physical quantities should remain visible. Assuming cooling consumes one liter per kilowatt-hour of equipment electricity gives about 0.016 liters per 1,000 responses. Applying the 2023 U.S. data-center average of 4.52 liters of electricity-related water consumption per kilowatt-hour adds about 0.088 liters. Together, the assumptions put modeled serving water consumption at roughly 0.10 liters per 1,000 responses.
That estimate covers serving under the stated assumptions. A facility-specific or lifecycle account would also need evidence on local cooling, electricity generation, training, and equipment manufacturing. It would distinguish consumption from withdrawal, since some withdrawn water returns to its source. Where a defensible monetary value is unavailable, the physical quantity can still be reported and the monetary account identified as incomplete.
| Resource Measure | U.S. Annual Estimate |
|---|---|
| Data-center electricity | 176 TWh |
| Direct water consumption | 66 billion liters |
| Electricity-related water consumption | Nearly 800 billion liters |
| Electricity-related emissions | 61 million metric tons CO₂e |
Historical estimates for all U.S. data centers in 2023, not AI alone. Electricity-related estimates use regional grid mixes and exclude adjustments for individual power-purchase agreements.
Sources: Lawrence Berkeley National Laboratory

Why Costs Fall
More capable hardware can spread its purchase price across greater output. Model improvements can reduce the computation required for a given result, and serving software can help the same equipment process more requests. These gains help explain why access to an established capability can become cheaper even as frontier development remains expensive.
Batching illustrates the tradeoff. Processing several requests concurrently can lower cost per response by increasing throughput. If requests have to wait too long for a batch to form, the same configuration may be unsuitable for a live service. A meaningful cost comparison therefore holds the required service level steady.
Competition determines how much of the gain reaches customers. A lower rental or API price can reflect improved efficiency, tighter supplier margins, or both. FCC captures what the purchaser pays per workload. Measurements of electricity and other inputs show whether the underlying production process also uses fewer resources.
The scope of those measurements can materially change the result. In May 2025, the estimated electricity use of the median Gemini Apps text prompt was 0.24 watt-hours when supporting systems and reserved idle capacity were included, compared with 0.10 watt-hours under a narrower accounting boundary. The comparison shows how much the reported figure can change for the same service when more of its infrastructure is counted.
| Hardware Measure | Reported Annual Change |
|---|---|
| 16-bit computational performance | 43% increase |
| Cost per unit of performance | 30% decrease |
| Energy efficiency | 40% increase |
Historical hardware trends summarized in the 2025 AI Index. These rates are not additive and do not directly predict application costs.
Sources: Stanford HAI

What Cheaper Compute Changes
One million responses at the theoretical FCC reference would imply about $92 in rented accelerator capacity. Integration and employee review can readily cost more. For the exporter’s finance director, the relevant question is whether the margin on smaller orders can cover the complete cost of serving those buyers.
A firm might once have declined an order because the time required to translate correspondence and provide support would consume the margin. Lower computing costs can bring some of those orders within reach, provided demand is there and the firm can manage errors. The firm may become able to sell work it previously declined.
If those additional orders go through, the exporter may buy more from domestic suppliers. Competition may also pass some savings on to buyers, leaving them more to spend elsewhere. How far the gains spread depends on who receives them and how much of the subsequent spending goes toward domestic output. Imported computing can support local production even as the payment for computing accrues abroad.
A study of 5,172 customer-support agents found that AI assistance increased issues resolved per hour by an average of 15 percent, with gains varying by experience. The study measures the productivity effect of introducing the tool in that workplace. It leaves open how much falling compute prices contributed to the economics of deploying it.
Shared infrastructure can reduce the capital that smaller firms need to enter a market. It can also let businesses in countries without frontier laboratories build services around imported computation. The same computing price, however, takes a larger share of revenue at some firms than at others. Reliable connectivity, useful local data, and employees who can apply and check the results determine how much productive work that expenditure buys.
Resource demand can rise as those uses spread. If electricity per request falls by half and the number of requests triples, total electricity consumption rises by half. The customers benefiting from cheaper service may be far from the facilities supplying it. The additional demand for electricity and cooling is felt where those facilities operate.
| Worker Comparison | Observed Result |
|---|---|
| Lowest pre-adoption skill quintile | 36% more resolutions per hour |
| Highest pre-adoption skill quintile | No statistically significant productivity change |
| AI access from the first month | About 2.5 resolutions/hour after 2 months |
| No AI access | About 2.5 resolutions/hour after 8–10 months |
Results from one customer-support deployment. Skill-group effects control for tenure; learning figures describe observed experience curves. Neither isolates the effect of lower compute prices.
Sources: Brynjolfsson, Li and Raymond
A Standard That Remains Comparable
The historical token-price series tracks the price of reaching a fixed capability threshold. The theoretical FCC reference estimates what a specific workload would cost at a given rental rate and measured throughput. Each can be tracked over time using its own definition.
A repeatable standard should hold the workload, service requirements, and accounting boundary steady while updating prices and measured inputs. Other capability classes require their own reference values. Comparisons across countries should apply local prices and resource conditions to equivalent work. Electricity and water should remain visible in physical units, especially where their monetary values differ.
For the exporter, a lower FCC can make smaller orders worth taking. For the communities hosting the infrastructure, the question is how much electricity and water the added work requires in aggregate. The financial reference answers a defined part of the first question. A full economic account would show how much of the cost is borne in producing the service and where those burdens fall.
| Account | Reporting Unit | Comparison Rule |
|---|---|---|
| Financial cost | Currency per 1,000 reference requests | Disclose price date and cost boundary |
| Full economic cost | Currency per 1,000 reference requests | Reconcile overlaps; identify missing costs |
| Electricity | kWh per 1,000 reference requests | Preserve equipment and facility boundaries |
| Water consumption | Liters per 1,000 reference requests | Separate direct and electricity-related use |
| Business acceptance | Accepted responses as % of completed requests | Retain the same acceptance test |
Proposed article framework, not an adopted industry standard. All comparisons retain the reference workload and service requirements; incomplete FECC accounts remain labeled incomplete.
Calculation Note:
The figures in this article establish a theoretical baseline for future comparisons using inputs available at publication in late 2026. They illustrate how financial and resource costs can be calculated for a defined workload. Results will vary by model, hardware, utilization, facility, and region. Future comparisons should specify which inputs have changed and hold the workload and service requirements constant wherever possible.
The theoretical Financial Compute Cost (FCC) of $0.0916 per 1,000 benchmark responses applies the October 26, 2026 published rental rate of $4.29 per H100 hour to measured Llama 3.1 8B Instruct throughput. It estimates steady-state serving costs under the stated conditions. Adding an illustrative training-compute allocation based on two hypothetical lifetime output volumes yields a subtotal of $0.1163–$0.3393 per 1,000 responses.
Electricity and Water Costs per 1,000 Responses (End of 2026)
| Accompanying Serving Resource | Modeled Use per 1,000 Responses | Assumed Value | Cost |
|---|---|---|---|
| Electricity | 0.0195 kWh | $0.10 per kWh | $0.00195 |
| Water consumed in cooling and electricity generation | Approximately 0.10 liters | $0.002 per liter | $0.00020 |
| Total illustrative electricity and water cost | $0.00215 | ||
Theoretical baseline for future comparisons using modeled resource use and assumed unit values. Actual costs vary by model, facility, and region. The total is reported separately because rental and electricity prices may already cover some of these costs.
Estimated Per Token: 0.00000021500000000
TL;DR
- Falling AI compute prices can make it profitable to serve customers or take on work a business previously declined.
- Financial Compute Cost (FCC) measures attributable expenditure per specified workload.
- The theoretical FCC reference is $0.0916 per 1,000 benchmark responses, calculated from measured Llama throughput and a published H100 rental rate.
- Actual deployment costs depend on utilization, idle capacity, and service requirements. The cost per usable response also depends on how many responses pass the business’s acceptance test.
- Full Economic Compute Cost (FECC) accounts for the underlying cost of producing the workload, including attributable resource burdens outside the purchaser’s bill.
- Adding a hypothetical allocation for training compute yields an illustrative subtotal of $0.1163–$0.3393 per 1,000 responses. The full economic cost remains undetermined.
- Electricity and water use should be reported in physical units alongside monetary estimates.
- Business gains can spread through additional orders for suppliers and greater purchasing power for customers.
- Total resource use can rise even as each response requires less electricity.
Sources
- Stanford HAI; 2025 AI Index Report: Research and Development; – Link
Establishing Financial Compute Cost
- ML.ENERGY; Text Conversation Benchmark Dataset; – Link
- Lambda; GPU Cloud Pricing; – Link
- FinOps Foundation; Cost Estimation of AI Workloads; – Link
Establishing Full Economic Compute Cost
- Meta; Llama 3.1 8B Instruct Model Card; – Link
- Lawrence Berkeley National Laboratory; 2024 United States Data Center Energy Usage Report; – Link
- Elsworth and colleagues, Google; Measuring the Environmental Impact of Delivering AI at Google Scale; – Link
Why Costs Fall
- NVIDIA; LLM Inference Benchmarking: How Much Does Your LLM Inference Cost?; – Link
- ML.ENERGY; Diagnosing Inference Energy Consumption with the ML.ENERGY Leaderboard v3.0; – Link
What Cheaper Compute Changes
- Brynjolfsson, Li and Raymond, The Quarterly Journal of Economics; Generative AI at Work; – Link
- World Bank; Digital Progress and Trends Report 2025: Strengthening AI Foundations; – Link
A Standard That Remains Comparable
Keywords: Internet Economics, Artificial Intelligence, Compute Costs, Business Productivity, Resource Consumption, Financial Compute Cost, Full Economic Compute Cost.